Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.10758695
- Product Categories
- Friendly Links
Information Name: | Dingxi factory direct grout |
Published: | 2013-11-08 |
Validity: | 300 |
Specifications: | |
Quantity: | 9999.00 |
Price Description: | |
Detailed Product Description: | CGM-1 (General) high-strength non-shrink grout Advisory: 18690497786 Swinge grout company is a professional manufacturer, mainly include: equipment foundation grout, grout repair roads, bridges, building body repair grout, grout column reinforcement material, CGM grouting material, HGM grouting material, BY grout, H-40 grouting material, H-60 ??grouting material, once Block slurry, secondary grouting material, bearing grout is certified by the National Testing chamber professional grout manufacturers. CGM strength non-shrink grout is applied in practice HGM grouting material for many years on the basis of improved second-generation upgrade inorganic, high strength, early strength, micro-expansion grout. There are four kinds, CGM-1 Universal, CGM-2 pisolite type, CGM-3 Superfine, CGM-4 ultra-early strength ★ Features 1. Early strength, high compressive strength :1-3 days up to 30-50Mpa more. (2) the gravity high: to fill all the gaps and meet the requirements of secondary grouting equipment. 3 micro-expansion: to ensure close contact between the equipment and infrastructure, secondary grouting contraction. High bond strength, bond strength with steel not less than 6Mpa. 4 can be winter construction: Allows outdoor temperatures of -10 ℃ construction. 5. Durability: This product is inorganic cementing materials, life is more than the life of the concrete foundation. After a million times fatigue test, 50 freeze-thaw cycle experiment no significant change. 30 days immersed in the oil intensity has improved significantly. ★ Usage 1. Apply to the machine base, foundation grouting anchor bolts and other equipment. (2) Building beams, plates, columns, foundation, floor and road reinforcement, repair and reinforcement. 3 can be the anchor bolts and steel and structural reinforcement. 4 subways, tunnels, underground construction joints and other projects against the play embedded solid. 5 and Steel (rail, steel, steel columns, etc.) is fixedly connected with the base of the secondary grouting. ★ reference amount calculated by reference to the amount of 2.28 to 2.4 tons / cubic meter basis, calculate the actual usage. ★ Technical Specifications Item Model Compressive strength (MPa) vertical expansion (%) Fluidity (mm) slump (mm) reinforced the bond strength (MPa) maximum aggregate size 1d 3d 28d round rebar CGM- 1 (Universal) 25-50 45-55 65-85 ≥ 0.02 240-300 ---- ≥ 6 ≥ 13 6-8 mesh CGM-2 (Reinforced) 25-50 40-55 65-85 ≥ 0.02 - --- 240-290 ≥ 6 ≥ 13 pisolite CGM-3 (superfine) 15-30 27-45 55-65 ≥ 0.02 240 ---- ≥ 6 ≥ 13 20-38 Head - 1d 3d 28d - ----------- CGM-4 (ultra-early strength) ≥ 15 40-45 55-65 ≥ 0.02 220 ------ 6-8 Subheading Note: 1. Compressive strength according to: "GB177-85 cement mortar strength test methods"; expansion press: "GB119-88 concrete admixture technical specifications." 2 grout layer thickness δ ≥ 150mm, the choice of CGM-1 or CGM-2; grouting thickness 30mm <δ <150mm, the selection of CGM-1 or CGM-2; grouting thickness δ ≤ 30mm, the selection of CGM-1 or CGM-3 type; pavement repair, selection of CGM-4 type. ★ Chaimo ambient temperature and curing time and the relationship between daily minimum temperature (℃) demolition of film time (h) curing time (h) -10 ~ 0 96 14 0 ~ 5 72 10 5 ~ 15 48 7 ≥ 15 24 7 ★ Construction Step 1 Prepare a blender, filling equipment, templates and maintenance items, cleaning grout space and advance to the concrete surface wetting. 2 branches set up a template with cement (sand) pulp, plastic tape closure imposed to ensure watertight connection template, plasma leakage. 3. The grout water content of 12-15% by weight of water mixing (mechanical stirring for 2-3 minutes, stirring for 5 minutes or artificial). 4 Stir the grout grout poured parts from one direction. If necessary, drill rod with bamboo strips or diversion, may be appropriate vibration or tapping templates. 5 immediately after construction is completed curing compound or cover or plastic film and affix straws wet curing blankets 3-7 days. 6 Use the temperature is -10 ℃ to 40 ℃. Prohibited in the grouting compound mixed with any additives or admixtures. ★ Packing and Storage 1. Grout is 50kg bags, stored in a dry place and avoid direct sunlight. 2 shelf life of three months beyond the expiration date should recheck qualified before use. | | |
Admin>>>
You are the 10725 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Swinge Special Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 10725 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Swinge Special Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility